
Pelagos Data Centres Unveils Ambitious 250 MW Facility Near Port of Gibraltar
Gibraltar, September 8, 2025 – Pelagos Data Centres has today announced a significant and ambitious development plan for a state-of-the-art 250 MW data centre facility, strategically located in close proximity to the bustling Port of Gibraltar. This groundbreaking project signals a substantial investment in cutting-edge digital infrastructure, poised to leverage Gibraltar’s unique geographical advantages and burgeoning digital economy.
The proposed facility, with a projected capacity of 250 megawatts, represents a considerable leap forward in data centre capabilities for the region. This substantial power allocation underscores the scale and advanced nature of the planned operations, suggesting a facility designed to accommodate high-density computing and large-scale data processing needs.
Pelagos Data Centres has highlighted the strategic importance of its chosen location. The proximity to the Port of Gibraltar is a key factor, offering excellent connectivity and logistical advantages. This positioning is expected to facilitate seamless integration with global data flows and provide robust infrastructure for both terrestrial and subsea cable networks, crucial for high-performance data centre operations.
While specific details regarding the design and technology of the 250 MW facility are yet to be fully disclosed, the announcement from Pelagos Data Centres points towards a commitment to sustainability and operational efficiency. In an era where environmental considerations are paramount, it is anticipated that the new facility will incorporate advanced cooling systems, renewable energy solutions, and energy-efficient technologies to minimize its ecological footprint.
The development of such a large-scale data centre is expected to bring significant economic benefits to Gibraltar. It has the potential to attract further investment in the technology sector, create numerous skilled employment opportunities during the construction and operational phases, and bolster Gibraltar’s position as a hub for digital services and innovation. The increased data processing and storage capacity could also enhance the performance and reliability of existing digital services within the territory and for its international clientele.
This ambitious project by Pelagos Data Centres underscores the growing global demand for secure, reliable, and high-capacity data infrastructure. The chosen location near the Port of Gibraltar offers a unique confluence of strategic advantages, including connectivity, a favourable regulatory environment, and access to a skilled workforce.
Further announcements regarding project timelines, investment figures, and specific technological implementations are anticipated as Pelagos Data Centres progresses with its detailed planning and development phases. The unveiling of this 250 MW facility marks a pivotal moment for Gibraltar’s digital future, promising to enhance its capabilities and attractiveness as a premier location for critical data infrastructure.
AI has delivered the news.
The answer to the following question is obtained from Google Gemini.
PR Newswire Heavy Industry Manufacturing published ‘Pelagos Data Centres lanza un ambicioso plan para una nueva planta de 250 MW cerca del Puerto de Gibraltar’ at 2025-09-08 07:01. Please write a detailed article about this news in a polite tone with relevant information. Please reply in English with the article only.